Insights and News Archives

Middlesex St (Phase 1)

We were appointed by Tolent Construction to demolish Cromlech House and United Standards House. The site sits with close proximity to Petticoat Lane market and has been divided up into 2 phases. Phase 1 being Cromlech House and phase 2 being United Standards House. The site had already been soft stripped...

Date: 01/12/2016

Author:

Read more

Times House, Wapping

Downwell have just completed a 7 month partial demolition project in Wapping for St George. The project comprised of  various demolition works within a 5 storey concrete framed building. The project is part of a major regeneration of the London Dock area which is to provide new homes and recreational spaces...

Date: 12/03/2016

Author:

Read more

31-33 Maddox St, London

To enable the demolition works a large and complex temporary works, installation had to be designed and installed by Downwell. The building was completely encapsulated with flame retardant Monarflex and an access staircase was erected to allow safe access and egress for the workforce. The project was completed without...

Date: 17/04/2015

Author:

Read more

  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer
  • Spacer

100 years of demolition experience

Contact

Please select the division you wish to connect with: