Middlesex St (Phase 1)

Demolition City We were appointed by Tolent Construction to carry out demolition city at Cromlech House and United Standards House. The site sits with close proximity to Petticoat Lane market and has been divided up into 2 phases. Phase 1 being Cromlech House and phase 2 being United Standards House. The...

Date: 01/12/2016

Author:

Read more

90-92 Blackfriars Rd

Blackfriars Road Demolition The demolition project we were appointed to complete on Blackfriars Rd was divided into 2 phases. The first phase was the asbestos removal and soft strip. The second phase was the demolition of the structures down to ground floor slab level. Scope of Works All of...

Date: 19/04/2016

Author:

Read more

Mild May Hospital

Project Name: Mild May Hospital Project Address: 19 Tabernacle Gardens, London, E2 7DZ Client: Ardmore Scope of works: Asbestos removal Demolition down to ground floor slab Removal of slab and foundations Crushing concrete arisings to certified 6F2 Home Page Link Demolition Insights

Date: 10/07/2015

Author:

Read more

31-33 Maddox St, London

Demolition in Central London A demolition project in Central London involving the Demolition of building which had party walls on either side. Inner City Environmental carried out extensive asbestos removal works. To enable the demolition works a large and complex temporary works had to be designed and installed by...

Date: 17/04/2015

Author:

Read more