The Surveyors World Cup line up

The final confirmed Line up for the Surveyors World Cup is as follows.

Each team will be given 7 T – Shirts in the colours indicated in brackets. They are based on the colours of the home or away kit of their designated country. Sizes are as per requested where teams specified by the due date.

World Cup Teams Kit

Where team shirts clash bibs will be used. Each team is only allowed 7 players per squad. For those with a designated goalkeeper please bring a goalkeepers jersey.

CS2 – Poland (Red)

Kier London – Serbia (White)

Merebrook – Spain (Red)

Martin Arnold – Sweden (Royal Blue)

Fairhurst – Argentina (Dark Grey)

RPS Group – Iceland (Royal Blue)

Downwell – Tunisia

Quinn London – Switzerland (Cherry Red)

Stace – Croatia (Red)

Ashe Construction – Brazil (Yellow)

Ridge and Partners – Costa Rica (Red)

Crest Nicholson – Panama (Deep Red)

Dawnus – Russia (Red)

GVA – Germany (Turquoise)

Potter Raper – France (Light Navy)

Robinson Low Francis – Australia (Yellow)

Artelia Group – Belgium (Pale Yellow)

Mount Anvil – Portugal (Deep Red)

NPS Group – Denmark (Fushia)

Wilmott Dixon – Republic of Ireland (Green)

Ingleton Wood – England (White)

Paragon Building Consultancy – Saudi Arabia (Pistachio)

Dandara – Nigeria (Pistachio)

Edward Cooper Young – Mexico (Forest Green)

Gleeds – Morroco (Rasberry)

Calco-  Senegal (Kelly Green)

Philip Pank – Egypt (White)

Vinci – Japan (Red)

Galliard Homes – Korea (Red)

Workman – IR Iran (White)

Gardner and Theobald – Wales (Red)

Calfordseaden – Scotland (Light Navy)

Malcolm Hollis – Uruguay (Sky Blue)

Roka Construction – Peru (White)

Naismiths – Columbia (Used Yellow)

The drawn Groups are http://tournaments.playfootball.net/viewGroups.aspx?tournId=1597

Return home page link

The Surveyors World Cup line up and groups

100 years of demolition experience

Contact

Please select the division you wish to connect with:

Coronavirus (COVID-19) Statement - Wednesday 25th March

The Prime Minister’s announcement on Monday evening signalled the introduction of more stringent restrictions on us all and has specifically indicated that members of the public should only leave their home for very limited purposes. The message indicates that we should travel to and from work, only where this is absolutely necessary.

The management of the Downwell Group of companies which includes: Downwell Demolition, Inner City Environmental and Inner City Scaffolding has very carefully considered both the meaning and the spirit of the Prime Minister’s statement and whilst there has been some clarification from government subsequently that building sites could continue to operate, we came to the very clear decision yesterday that it was necessary for us, as a responsible contractor, to safely and securely close down our operational sites as soon as reasonably possible. Doing so will assist in maintaining the wellbeing of our customers, employees, sub-contractors, suppliers and the wider communities within which we build.

All sites have been closed down in a safe and secure manner and will remain closed until further notice.

We would like to take this opportunity of thanking all the key workers on the frontline who are continiung working for the good of us all.