58 Shepherds Bush Green, W12
Downwell demolition were employed for the demolition of the majority of the structure with the facade on two sides of the building being retained
Demolition West London
Downwell were employed for the demolition of the majority of the structure with the facade retention on two sides of the building being retained. This was so it could be used in the building of the new hotel which was to be constructed in its place.
Our works also included the removal of ground works and a reduced dig to facilitate an underground car park. As the project was adjacent to the public foot path, measures had to be implemented to keep the public safe at all times during demolition.
Extensive environmental measures were carried out due to the post office next door, to reassure that there was no damage caused by our operations to the property.
The project was completed on time and free from incidents.
58 Shepherds Bush Green, W12
Value: £1m
Duration: 20 weeks