31-33 Maddox St, London

A project located in Central London with party walls on either side of the building.

Demolition in Central London

A demolition project in Central London involving the Demolition of building which had party walls on either side.

Inner City Environmental carried out extensive asbestos removal works.

To enable the demolition works a large and complex temporary works had to be designed and installed by Downwell to support the buildings of either side.

The building was completely encapsulated with flame retardant Monarflex and an access staircase was erected to allow safe access and egress for the workforce. This was carried out by Inner City Scaffolding.

The majority of the work was carried out using hand demolition methods.

The walls of the adjacent buildings were weatherproofed after the demolition.

The project was completed without any accidents or reportable incidents and within the agreed programme.

Home Page Link
Demolition Insights Page

31-33 Maddox St, London

Value: £1.1m

Duration: 12 week

100 years of demolition experience

Contact

Please select the division you wish to connect with:

Coronavirus (COVID-19) Statement - Wednesday 25th March

The Prime Minister’s announcement on Monday evening signalled the introduction of more stringent restrictions on us all and has specifically indicated that members of the public should only leave their home for very limited purposes. The message indicates that we should travel to and from work, only where this is absolutely necessary.

The management of the Downwell Group of companies which includes: Downwell Demolition, Inner City Environmental and Inner City Scaffolding has very carefully considered both the meaning and the spirit of the Prime Minister’s statement and whilst there has been some clarification from government subsequently that building sites could continue to operate, we came to the very clear decision yesterday that it was necessary for us, as a responsible contractor, to safely and securely close down our operational sites as soon as reasonably possible. Doing so will assist in maintaining the wellbeing of our customers, employees, sub-contractors, suppliers and the wider communities within which we build.

All sites have been closed down in a safe and secure manner and will remain closed until further notice.

We would like to take this opportunity of thanking all the key workers on the frontline who are continiung working for the good of us all.