Quay House is a former office building located in Canary Wharf E14. The Firethorn Trust owns it.

Scope of Works

• Asbestos Removal
• Protection Scaffolding
• Strip Out
• Demolition
• Removal of Slab and Foundations

The DLR

The building was within 2m of the DLR viaduct, so we have had to work very closely with the DLR to produce a method that would meet their strict health and safety requirements.

Tower Hamlets Council

Additionally, Tower Hamlets were involved in the method planning with DLR and we were required to ensure that 24/7 noise and dust monitoring was installed.

Protection Scaffolding

Working closely with the DLR and Inner City Scaffolding protection, scaffolding was designed and erected under a watching brief to ensure that it was clear of the viaduct. In addition, Protection scaffolding was erected to the sides and rear of the building to protect the pedestrian footpath running to the back of the building along the South Dock. This also serves to provide dust protection to the water.

Asbestos Removal and Strip Out

The building contained minimal asbestos, which Inner City Environmental removedStrip-out work included removing suspended flooring, computer floors, and partitions.

Demolition

Demolition has begun at the time of writing (21st June 2022) using a high reach machine under a watching brief by DLR.

This page will be updated as the project progresses.

Return to Home Page

 

Project Name:
Carlton House

Location:
Upper Richmond Rd, Putney, SW15 2BS

Client:
Firethorn Trust

Project Dates:
May - July 2022

Project Value:
£300,000

ALWAYS FIRST FOR DEMOLITION

Contact

    Please select the division you wish to connect with: