Site Clearance in Bow

Downwell was appointed to carry out the remediation of a large site in Bow, East London. The site had been heavily fly-tipped over a long period of time.

Site clearance and remediation in East London

August 2021 – This is a site clearance project that we are currently undertaking.

This large site is situated close to the Blackwell Tunnel. The developer will build Luxury apartments on the site. Downwell was initially appointed to clear Waste, Vegetation, Japanese Knotweed and carry out Demolition of various buildings on site.

An ecologist surveyed the site to check for wildlife that would be affected before the works started.

The Japanese Knotweed Reynoutria japonica was treated and the contaminated soil was removed from the site by an appointed specialist.

Concrete and bricks which had been left on-site were crushed and stockpiled on site.

We are currently awaiting confirmation to carry out complete remediation of the site, including breaking out of the large areas of the concrete slabs spread throughout the site.

For more information on our services please tel: 01708 932 3000 or visit www.downwell.co.uk

The site had been heavily fly tipped over along period of time

ALWAYS FIRST FOR DEMOLITION

Contact

    Please select the division you wish to connect with: