The Gascoigne Estate

The Gascoigne Estate, Barking is currently undergoing a significant regeneration programme through BeFirst. After completing phase 1 demolition works for Wates at the Gascoigne Estate last year Downwell successfully tendered for Phase 2.

Demolition Barking – Gascoigne Estate

This phase of the works involved the demolition of a series of three-story residential blocks set over a large area of the Gascoigne Estate.

The blocks required environmental cleaning to remove pigeon guano and waste left by the former residents. Asbestos surveys revealed both licensed and non-licensed ACM’s.

Inner City Environmental was appointed to carry out the environmental cleaning and asbestos removal.

Protection scaffolding was erected by Inner City Scaffolding.

The Works

Working in conjunction with Inner City Environmental, the blocks were cleansed, cleared of asbestos, and soft stripped in sequence by 30-tonne machines. Slab and foundations were grubbed up, and the materials were crushed on-site to form piling mats. The Wates appointed groundwork company followed behind Downwell to begin the redevelopment of the site.

Social Value

Supporting the local community is an integral part of any project we undertake, and we were able to support Wates by donating materials for use in constructing a community garden.

We also donated 100 hi-vis vests to the local School for use on School trips and will also be hosting our ‘Demolition Challenge’ initiative in September with the School.

Reuse and recycling of materials

We achieved our target of 96% of materials from the site for reuse and recycling. We were able to recycle the UPVC frames from the buildings included within this.

Gascoigne Estate Video Links

 

 

For demolition, Insights go to https://www.downwell.co.uk/insights-and-news/

Return to home page

 

 

 

Downwell was awarded Phase 2 of the demolition at the Gascoigne Estate by Wates Residential