Heathside and Lethbridge – Phase 5

Phase 5 – Asbestos Removal and Demolition in Lewisham After completion of phase four we secured phase 5 working with our established client Ardmore Construction. The scope of works included: Environmental Cleaning – clearance of pigeon guano and sweep for sharps and needles Asbestos removal Protection of substations Soft...

Date: 10/01/2020

Author:

Read more

Manor Place Depot

Industrial Estate Demolition We were appointed by Durkan to carry out the Industrial Estate Demolition of  the former Manor Place Estate. The site was set over a 14,000m2 area with a viaduct running through the middle of the site, splitting it into 2 sections. You could travel between the 2 sections...

Date: 09/10/2017

Author:

Read more

Sherwood Close, W13

Housing Demolition – Regeneration in Ealing We were appointed by Lovell to carry out housing demolition at  various residency blocks as part of a major regeneration of the area. The project, once completed is going to be a thriving neighbourhood with green tree lined avenues, communal courtyards, private gardens, play areas and private...

Date: 14/12/2016

Author:

Read more

90-92 Blackfriars Rd

Blackfriars Road Demolition The demolition project we were appointed to complete on Blackfriars Rd was divided into 2 phases. The first phase was the asbestos removal and soft strip. The second phase was the demolition of the structures down to ground floor slab level. Scope of Works All of...

Date: 19/04/2016

Author:

Read more

Heathside & Lethbridge Phase 4a & 4b

Demolition South London Project Name: Heathside & Lethbridge Phase 4a & 4b Project Address: Heathside & Lethbridge Estate, Lewisham, London Client: Ardmore Scope: Asbestos removal Soft strip High reach demolition down to ground floor slab Remove slabs and foundations and crush to certified 6F2   Link to later phase...

Date: 13/07/2015

Author:

Read more

100 years of demolition experience

Contact

Please select the division you wish to connect with:

Coronavirus (COVID-19) Statement - Wednesday 25th March

The Prime Minister’s announcement on Monday evening signalled the introduction of more stringent restrictions on us all and has specifically indicated that members of the public should only leave their home for very limited purposes. The message indicates that we should travel to and from work, only where this is absolutely necessary.

The management of the Downwell Group of companies which includes: Downwell Demolition, Inner City Environmental and Inner City Scaffolding has very carefully considered both the meaning and the spirit of the Prime Minister’s statement and whilst there has been some clarification from government subsequently that building sites could continue to operate, we came to the very clear decision yesterday that it was necessary for us, as a responsible contractor, to safely and securely close down our operational sites as soon as reasonably possible. Doing so will assist in maintaining the wellbeing of our customers, employees, sub-contractors, suppliers and the wider communities within which we build.

All sites have been closed down in a safe and secure manner and will remain closed until further notice.

We would like to take this opportunity of thanking all the key workers on the frontline who are continiung working for the good of us all.